CONSTRUCTION OF VARIABLE DURATION TIMER

CONSTRUCTION OF VARIABLE DURATION TIMER: To design & study the two range 1-10 minute and 10-100 minute variable duration timer using IC 555, IC 4020 The output of the 4020 IC drives the transistor which turns “ON” the relay (i) + 12V/500mA power supply (ii) 230V mains operated

SKU: eb14c43f7a71 Category:

Description

Advanced Trainers Power Electronics

CONSTRUCTION OF VARIABLE DURATION TIMER

To design & study the two range 1-10 minute and 10-100 minute variable duration timer using IC 555, IC 4020 The output of the 4020 IC drives the transistor which turns “ON” the relay (i) + 12V/500mA power supply (ii) 230V mains operated

Selection Considerations

When evaluating CONSTRUCTION OF VARIABLE DURATION TIMER, consider the intended application, required operating parameters, capacity or measurement range, installation conditions, accessories and documentation relevant to your project. Confirm product-specific requirements and configuration with Interlabs before procurement.

About Interlabs

Interlabs, associated with International Biological Laboratories, supplies scientific, laboratory, educational and engineering equipment from India. The company identifies its history as dating to 1958. Contact Interlabs to confirm product details and supporting documentation for your requirement.

Request Product Information

Share your application and technical requirements for CONSTRUCTION OF VARIABLE DURATION TIMER to discuss suitability, available configurations and a quotation.

Request a Quote

Frequently Asked Questions

What is CONSTRUCTION OF VARIABLE DURATION TIMER used for?

To design & study the two range 1-10 minute and 10-100 minute variable duration timer using IC 555, IC 4020 The output of the 4020 IC drives the transistor which turns “ON” the relay (i) + 12V/500mA power supply (ii) 230V mains operated

What should I confirm before ordering CONSTRUCTION OF VARIABLE DURATION TIMER?

Confirm the intended application, technical specifications, available configuration, accessories, documentation and delivery requirements with Interlabs.